73 delay minutes

The biggest share (32%) of the delay picked up at Braintree in the four weeks to 9 December 2023 came from faulty trains.

81% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power45%16% 0 a day, the least in 5 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn810%7% 0 a day, the least in 5 years-
External57%4% 0 a day, more than 2 of the other 4 years-
Network management34%17% 0 a day, the least in 5 years-
The operators' causes
Train faults2332%16% 1 a day, more than 2 of the other 4 years-
Traincrew34%11% 0 a day, the least in 5 years1
Stations--3% 0 a day, the least in 5 years-
Operations1825%5% 1 a day, the most in 5 years-
Operator, other1013%7% 0 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar9
TATrain-crew/loco/stock/unit diagram issues9
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)6
FWLate start/yard overtime not explained by Operator5
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)5
Q3NZ Pumps T5
TTLeaf fall Neutral5
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure4
M0Confirmed train cab based safety system fault (including GSMR)4
M8Technical failures above the Solebar4
Since 2018
CodeWhat Network Rail loggedMinutes
JSCondition of Track TSR outside the Timetable Planning Rules2,175
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)1,120
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.899
TGDriver741
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure443
M7Door and Door system faults433
M8Technical failures above the Solebar426
MDTechnical failures below the solebar341
IBPoints failure (including no fault found)304
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)275