Braintree
73 delay minutes
The biggest share (32%) of the delay picked up at Braintree in the four weeks to 9 December 2023 came from faulty trains.
81% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 4 | 5% | 16% | 0 a day, the least in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 8 | 10% | 7% | 0 a day, the least in 5 years | - |
| External | 5 | 7% | 4% | 0 a day, more than 2 of the other 4 years | - |
| Network management | 3 | 4% | 17% | 0 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 23 | 32% | 16% | 1 a day, more than 2 of the other 4 years | - |
| Traincrew | 3 | 4% | 11% | 0 a day, the least in 5 years | 1 |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | 18 | 25% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 10 | 13% | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 9 |
| TA | Train-crew/loco/stock/unit diagram issues | 9 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 6 |
| FW | Late start/yard overtime not explained by Operator | 5 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 5 |
| Q3 | NZ Pumps T | 5 |
| TT | Leaf fall Neutral | 5 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 4 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 4 |
| M8 | Technical failures above the Solebar | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JS | Condition of Track TSR outside the Timetable Planning Rules | 2,175 |
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 1,120 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 899 |
| TG | Driver | 741 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 443 |
| M7 | Door and Door system faults | 433 |
| M8 | Technical failures above the Solebar | 426 |
| MD | Technical failures below the solebar | 341 |
| IB | Points failure (including no fault found) | 304 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 275 |