Battersby
13 delay minutes
Most of the delay picked up at Battersby in the four weeks to 9 December 2023 came from how the network was run.
0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | 9 | 69% | 17% | 1 |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | 4 | 31% | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OU | Delays not Investigated by Network Rail | 9 |
| TZ | Other Passenger Train Operating Company causes | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JH | Critical Rail Temperature speeds, (other than buckled rails) | 144 |
| TG | Driver | 91 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 78 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 69 |
| TH | (Senior) Conductor/Train Manager | 69 |
| RB | Passengers joining/alighting | 67 |
| MD | Technical failures below the solebar | 67 |
| MY | Coupler, Coupler system and Jumper cable faults | 66 |
| OU | Delays not Investigated by Network Rail | 54 |
| IC | Track circuit failure (including no fault found) | 52 |