785 delay minutes
The biggest share (41%) of the delay picked up at Buxton in the four weeks to 9 December 2023 came from how the network was run.
50% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 193 | 25% | 16% | 7 a day, the most in 5 years | - |
| Weather and structures | 33 | 4% | 7% | 1 a day, more than 3 of the other 4 years | 1 |
| Autumn | 16 | 2% | 7% | 1 a day, more than 1 of the other 4 years | 2 |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 323 | 41% | 17% | 12 a day, the most in 5 years | 6 |
| The operators' causes | |||||
| Train faults | 41 | 5% | 16% | 1 a day, the least in 5 years | 4 |
| Traincrew | 125 | 16% | 11% | 4 a day, more than 3 of the other 4 years | 6 |
| Stations | 3 | <1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 44 | 6% | 5% | 2 a day, more than 2 of the other 4 years | - |
| Operator, other | 7 | <1% | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OM | Technical failure associated with a Railhead conditioning train | 220 |
| TG | Driver | 119 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 80 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 70 |
| IA | Signal failure (including no fault found) | 49 |
| IG | Block failure | 44 |
| JK | Flooding not due to exceptional weather | 33 |
| MY | Coupler, Coupler system and Jumper cable faults | 33 |
| OU | Delays not Investigated by Network Rail | 21 |
| J0 | Telecom equipment radio failure (GSM-R) | 17 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 2,596 |
| MD | Technical failures below the solebar | 1,930 |
| IA | Signal failure (including no fault found) | 950 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 792 |
| IB | Points failure (including no fault found) | 776 |
| OL | Signal Box not open during booked hours | 738 |
| TH | (Senior) Conductor/Train Manager | 731 |
| QA | WTT schedule and or LTP Process including erroneous simplifiers | 564 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 525 |
| T8 | Delays at Station believed to be operator cause and Information required from operator (Ops responsibility) | 471 |