Leaves on the Line

Bridgwater

BWT Western route
CSV JSON

297 delay minutes

The biggest share (35%) of the delay picked up at Bridgwater in the four weeks to 9 December 2023 came from signal, points and power faults.

46% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track83%8% 0 a day, more than 2 of the other 4 years-
Signals, points and power10335%16% 4 a day, the most in 5 years-
Weather and structures165%7% 1 a day, the most in 5 years-
Autumn155%7% 1 a day, more than 2 of the other 4 years-
External3411%4% 1 a day, more than 3 of the other 4 years-
Network management227%17% 1 a day, the least in 5 years-
The operators' causes
Train faults196%16% 1 a day, more than 1 of the other 4 years-
Traincrew83%11% 0 a day, the least in 5 years-
Stations3512%3% 1 a day, the least in 5 years1
Operations279%5% 1 a day, the most in 5 years-
Operator, other124%7% 0 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)85
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)21
RQUn-booked assistance for a person with reduced mobility joining/alighting,19
TZOther Passenger Train Operating Company causes15
XPBRIDGE HIT13
M7Door and Door system faults11
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure11
R5Station staff error - e.g wrong announcements misdirection10
FZOther FOC causes incl. cause to be specified, including mishaps8
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles8
Since 2018
CodeWhat Network Rail loggedMinutes
RQUn-booked assistance for a person with reduced mobility joining/alighting,1,498
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail1,208
MDTechnical failures below the solebar1,150
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure848
ICTrack circuit failure (including no fault found)835
TGDriver818
IBPoints failure (including no fault found)802
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.764
ZUNo Cause Identified After investigation by both Parties681
M8Technical failures above the Solebar593