Bridgwater
297 delay minutes
The biggest share (35%) of the delay picked up at Bridgwater in the four weeks to 9 December 2023 came from signal, points and power faults.
46% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 8 | 3% | 8% | 0 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 103 | 35% | 16% | 4 a day, the most in 5 years | - |
| Weather and structures | 16 | 5% | 7% | 1 a day, the most in 5 years | - |
| Autumn | 15 | 5% | 7% | 1 a day, more than 2 of the other 4 years | - |
| External | 34 | 11% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 22 | 7% | 17% | 1 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 19 | 6% | 16% | 1 a day, more than 1 of the other 4 years | - |
| Traincrew | 8 | 3% | 11% | 0 a day, the least in 5 years | - |
| Stations | 35 | 12% | 3% | 1 a day, the least in 5 years | 1 |
| Operations | 27 | 9% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 12 | 4% | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 85 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 21 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 19 |
| TZ | Other Passenger Train Operating Company causes | 15 |
| XP | BRIDGE HIT | 13 |
| M7 | Door and Door system faults | 11 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 11 |
| R5 | Station staff error - e.g wrong announcements misdirection | 10 |
| FZ | Other FOC causes incl. cause to be specified, including mishaps | 8 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 8 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 1,498 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 1,208 |
| MD | Technical failures below the solebar | 1,150 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 848 |
| IC | Track circuit failure (including no fault found) | 835 |
| TG | Driver | 818 |
| IB | Points failure (including no fault found) | 802 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 764 |
| ZU | No Cause Identified After investigation by both Parties | 681 |
| M8 | Technical failures above the Solebar | 593 |