Canterbury East
1,211 delay minutes
The biggest share (36%) of the delay picked up at Canterbury East in the four weeks to 9 December 2023 came from autumn leaves.
27% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 71 | 6% | 16% | 3 a day, more than 3 of the other 4 years | - |
| Weather and structures | 165 | 14% | 7% | 6 a day, more than 2 of the other 4 years | 1 |
| Autumn | 434 | 36% | 7% | 16 a day, the most in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 54 | 4% | 17% | 2 a day, more than 1 of the other 4 years | 2 |
| The operators' causes | |||||
| Train faults | 25 | 2% | 16% | 1 a day, more than 3 of the other 4 years | - |
| Traincrew | 9 | <1% | 11% | 0 a day, more than 2 of the other 4 years | - |
| Stations | 6 | <1% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | 19 | 2% | 5% | 1 a day, more than 3 of the other 4 years | - |
| Operator, other | 428 | 35% | 7% | 15 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 418 |
| TT | Leaf fall Neutral | 399 |
| OG | Ice on conductor rail/OHLE | 165 |
| IC | Track circuit failure (including no fault found) | 57 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 20 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 19 |
| QH | Adhesion problems due to leaf contamination | 16 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 15 |
| I1 | Overhead line/third rail defect | 14 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 13 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 7,936 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 2,778 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,986 |
| Q3 | NZ Pumps T | 1,901 |
| TT | Leaf fall Neutral | 1,769 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 1,250 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 1,007 |
| TG | Driver | 919 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 694 |
| JB | Reactionary Delay to 'P' coded TSRs | 677 |