4,638 delay minutes
The biggest share (34%) of the delay picked up at Cambridge in the four weeks to 9 December 2023 came from how the network was run.
68% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 298 | 6% | 8% | 11 a day, the least in 5 years | 1 |
| Signals, points and power | 544 | 12% | 16% | 19 a day, more than 2 of the other 4 years | 9 |
| Weather and structures | 276 | 6% | 7% | 10 a day, the most in 5 years | - |
| Autumn | 289 | 6% | 7% | 10 a day, the most in 5 years | 1 |
| External | 152 | 3% | 4% | 5 a day, more than 2 of the other 4 years | 7 |
| Network management | 1,567 | 34% | 17% | 56 a day, the most in 5 years | 36 |
| The operators' causes | |||||
| Train faults | 457 | 10% | 16% | 16 a day, more than 2 of the other 4 years | 15 |
| Traincrew | 766 | 17% | 11% | 27 a day, the least in 5 years | 77 |
| Stations | 102 | 2% | 3% | 4 a day, the most in 5 years | - |
| Operations | 69 | 1% | 5% | 2 a day, the least in 5 years | - |
| Operator, other | 118 | 3% | 7% | 4 a day, more than 1 of the other 4 years | 6 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 612 |
| OK | Delay caused by Operating staff oversight, issues or absence (excluding signallers and Control) | 345 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 265 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 247 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 230 |
| QJ | Special working for leaf-fall track circuit operation | 201 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 183 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 177 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 141 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 140 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 40,980 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 37,347 |
| TI | Traincrew rostering problem | 14,295 |
| M8 | Technical failures above the Solebar | 11,671 |
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 9,046 |
| IC | Track circuit failure (including no fault found) | 8,764 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 8,554 |
| I1 | Overhead line/third rail defect | 7,704 |
| IB | Points failure (including no fault found) | 6,966 |
| MD | Technical failures below the solebar | 6,734 |