Camborne
247 delay minutes
The biggest share (18%) of the delay picked up at Camborne in the four weeks to 9 December 2023 came from weather and structures.
37% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 19 | 8% | 8% | 1 a day, the most in 5 years | - |
| Signals, points and power | 24 | 10% | 16% | 1 a day, the least in 5 years | - |
| Weather and structures | 45 | 18% | 7% | 2 a day, more than 2 of the other 4 years | - |
| Autumn | 33 | 13% | 7% | 1 a day, more than 2 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 12 | 5% | 17% | 0 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 42 | 17% | 16% | 2 a day, more than 3 of the other 4 years | - |
| Traincrew | 19 | 8% | 11% | 1 a day, more than 3 of the other 4 years | - |
| Stations | 24 | 10% | 3% | 1 a day, the most in 5 years | - |
| Operations | 4 | 2% | 5% | 0 a day, more than 3 of the other 4 years | - |
| Operator, other | 26 | 10% | 7% | 1 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M7 | Door and Door system faults | 31 |
| Q3 | NZ Pumps T | 26 |
| TT | Leaf fall Neutral | 24 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 22 |
| TG | Driver | 19 |
| IK | Telecom equipment failure (including no fault found) | 17 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 14 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 13 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 11 |
| JK | Flooding not due to exceptional weather | 10 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| J3 | Axle Counter Failure | 1,457 |
| MD | Technical failures below the solebar | 1,282 |
| IA | Signal failure (including no fault found) | 1,075 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 982 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 958 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 832 |
| M7 | Door and Door system faults | 724 |
| TG | Driver | 719 |
| IC | Track circuit failure (including no fault found) | 594 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 497 |