Leaves on the Line

Camborne

CBN Western route
CSV JSON

247 delay minutes

The biggest share (18%) of the delay picked up at Camborne in the four weeks to 9 December 2023 came from weather and structures.

37% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track198%8% 1 a day, the most in 5 years-
Signals, points and power2410%16% 1 a day, the least in 5 years-
Weather and structures4518%7% 2 a day, more than 2 of the other 4 years-
Autumn3313%7% 1 a day, more than 2 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management125%17% 0 a day, the least in 5 years-
The operators' causes
Train faults4217%16% 2 a day, more than 3 of the other 4 years-
Traincrew198%11% 1 a day, more than 3 of the other 4 years-
Stations2410%3% 1 a day, the most in 5 years-
Operations42%5% 0 a day, more than 3 of the other 4 years-
Operator, other2610%7% 1 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
M7Door and Door system faults31
Q3NZ Pumps T26
TTLeaf fall Neutral24
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail22
TGDriver19
IKTelecom equipment failure (including no fault found)17
RQUn-booked assistance for a person with reduced mobility joining/alighting,14
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)13
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.11
JKFlooding not due to exceptional weather10
Since 2018
CodeWhat Network Rail loggedMinutes
J3Axle Counter Failure1,457
MDTechnical failures below the solebar1,282
IASignal failure (including no fault found)1,075
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail982
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles958
MNBrake and brake systems faults; including wheel flats where no other cause had been identified832
M7Door and Door system faults724
TGDriver719
ICTrack circuit failure (including no fault found)594
RQUn-booked assistance for a person with reduced mobility joining/alighting,497