1,403 delay minutes

The biggest share (21%) of the delay picked up at Canterbury West in the four weeks to 9 December 2023 came from other operator causes.

63% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track161%8% 1 a day, more than 2 of the other 4 years-
Signals, points and power16712%16% 6 a day, more than 1 of the other 4 years-
Weather and structures13410%7% 5 a day, the most in 5 years-
Autumn25818%7% 9 a day, the most in 5 years-
External--4% 0 a day, the least in 5 years-
Network management26919%17% 10 a day, more than 2 of the other 4 years19
The operators' causes
Train faults1078%16% 4 a day, more than 2 of the other 4 years-
Traincrew916%11% 3 a day, the most in 5 years-
Stations232%3% 1 a day, the most in 5 years-
Operations463%5% 2 a day, the most in 5 years-
Operator, other29321%7% 10 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T255
TTLeaf fall Neutral240
OGIce on conductor rail/OHLE131
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident81
TGDriver78
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)63
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure60
ICTrack circuit failure (including no fault found)37
MYCoupler, Coupler system and Jumper cable faults36
M0Confirmed train cab based safety system fault (including GSMR)30
Since 2018
CodeWhat Network Rail loggedMinutes
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)9,827
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,155
TGDriver1,920
IBPoints failure (including no fault found)1,801
ICTrack circuit failure (including no fault found)1,632
OCSignaller including mis-routing (not ERTM /ETCS related)1,583
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident1,260
XRCable vandalism or theft1,194
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions1,183
TTLeaf fall Neutral1,182