0 delay minutes

No delay was picked up at Charlbury in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar131
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.46
QBPlanned engineering work - diversion/SLW not timetabled (outside the Timetable Planning Rules)44
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)38
IBPoints failure (including no fault found)32
OCSignaller including mis-routing (not ERTM /ETCS related)29
TGDriver20
QMTrain schedule/STP Process including erroneous simplifiers17
OLSignal Box not open during booked hours14
TH(Senior) Conductor/Train Manager14