Leaves on the Line

Cardiff Bay

CDB Cardiff Valleys route
CSV JSON

50 delay minutes

The biggest share (40%) of the delay picked up at Cardiff Bay in the four weeks to 9 December 2023 came from problems at stations.

44% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power48%16% 0 a day, more than 2 of the other 4 years2
Weather and structures--7% 0 a day, the least in 5 years-
Autumn--7% 0 a day, the least in 5 years-
External--4% 0 a day, the least in 5 years-
Network management1020%17% 0 a day, more than 2 of the other 4 years-
The operators' causes
Train faults36%16% 0 a day, the least in 5 years11
Traincrew510%11% 0 a day, more than 1 of the other 4 years1
Stations2040%3% 1 a day, more than 3 of the other 4 years-
Operations816%5% 0 a day, more than 2 of the other 4 years-
Operator, other--7% 0 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
T2Delay at unstaffed station to non-DOO train20
TZOther Passenger Train Operating Company causes8
I6Delays as a result of line blocks / track patrols (including late handback)7
TGDriver5
IKTelecom equipment failure (including no fault found)4
M8Technical failures above the Solebar3
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver1,234
TH(Senior) Conductor/Train Manager1,171
M8Technical failures above the Solebar788
T2Delay at unstaffed station to non-DOO train746
QAWTT schedule and or LTP Process including erroneous simplifiers702
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)675
TZOther Passenger Train Operating Company causes583
MDTechnical failures below the solebar560
OUDelays not Investigated by Network Rail549
J3Axle Counter Failure480