Crediton
1,163 delay minutes
The biggest share (30%) of the delay picked up at Crediton in the four weeks to 9 December 2023 came from autumn leaves.
67% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 19 | 2% | 8% | 1 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 288 | 25% | 16% | 10 a day, more than 3 of the other 4 years | - |
| Weather and structures | 1 | <1% | 7% | 0 a day, the least in 5 years | - |
| Autumn | 349 | 30% | 7% | 12 a day, the most in 5 years | - |
| External | 12 | 1% | 4% | 0 a day, more than 2 of the other 4 years | - |
| Network management | 207 | 18% | 17% | 7 a day, more than 3 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 123 | 11% | 16% | 4 a day, more than 2 of the other 4 years | - |
| Traincrew | 28 | 2% | 11% | 1 a day, more than 3 of the other 4 years | - |
| Stations | 3 | <1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 17 | 1% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 117 | 10% | 7% | 4 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QI | Cautioning due to railhead leaf contamination | 235 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 134 |
| Q3 | NZ Pumps T | 111 |
| TT | Leaf fall Neutral | 111 |
| IG | Block failure | 104 |
| IC | Track circuit failure (including no fault found) | 54 |
| MD | Technical failures below the solebar | 54 |
| IK | Telecom equipment failure (including no fault found) | 37 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 32 |
| IA | Signal failure (including no fault found) | 30 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 2,184 |
| TG | Driver | 1,277 |
| IB | Points failure (including no fault found) | 1,248 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,128 |
| M7 | Door and Door system faults | 1,034 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 928 |
| IC | Track circuit failure (including no fault found) | 905 |
| M8 | Technical failures above the Solebar | 870 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 766 |
| ZU | No Cause Identified After investigation by both Parties | 763 |