Castleford
288 delay minutes
The biggest share (30%) of the delay picked up at Castleford in the four weeks to 9 December 2023 came from faulty trains.
49% of these minutes were knock-on from something that happened elsewhere first. 86% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 17 | 6% | 8% | 1 a day, more than 3 of the other 4 years | 1 |
| Signals, points and power | 17 | 6% | 16% | 1 a day, more than 1 of the other 4 years | - |
| Weather and structures | 15 | 5% | 7% | 1 a day, more than 3 of the other 4 years | - |
| Autumn | 25 | 9% | 7% | 1 a day, more than 3 of the other 4 years | - |
| External | 13 | 5% | 4% | 0 a day, more than 1 of the other 4 years | - |
| Network management | 72 | 25% | 17% | 3 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 86 | 30% | 16% | 3 a day, more than 3 of the other 4 years | 1 |
| Traincrew | 14 | 5% | 11% | 1 a day, the least in 5 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | 19 | 7% | 5% | 1 a day, more than 3 of the other 4 years | - |
| Operator, other | 11 | 4% | 7% | 0 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OU | Delays not Investigated by Network Rail | 30 |
| M8 | Technical failures above the Solebar | 27 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 22 |
| MT | Confirmed train borne safety system faults (not cab based) | 21 |
| QJ | Special working for leaf-fall track circuit operation | 17 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 15 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 13 |
| J0 | Telecom equipment radio failure (GSM-R) | 13 |
| M7 | Door and Door system faults | 11 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 11 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 1,054 |
| MD | Technical failures below the solebar | 964 |
| TH | (Senior) Conductor/Train Manager | 720 |
| IB | Points failure (including no fault found) | 606 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 574 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 571 |
| M7 | Door and Door system faults | 501 |
| IC | Track circuit failure (including no fault found) | 470 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 440 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 414 |