55 delay minutes

The biggest share (31%) of the delay picked up at Chafford Hundred in the four weeks to 9 December 2023 came from signal, points and power faults.

78% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track611%8%-
Signals, points and power1731%16%-
Weather and structures--7%-
Autumn24%7%-
External--4%-
Network management1324%17%-
The operators' causes
Train faults916%16%-
Traincrew--11%-
Stations--3%-
Operations24%5%-
Operator, other611%7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)11
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.6
MUDepot operating problem6
ACWaiting Train preparation or completion of TOPS list/RT39734
IHPower Supply And Distribution System Failure4
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)4
QMTrain schedule/STP Process including erroneous simplifiers4
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)4
M8Technical failures above the Solebar3
FHFOC Planning issue (not diagramming or rostering)2
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.351
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)261
TGDriver248
VHPassenger Communication cord, door egress or emergency train alarm operated217
I8Animal Strike or Incursion within the control of Network Rail176
OCSignaller including mis-routing (not ERTM /ETCS related)128
QMTrain schedule/STP Process including erroneous simplifiers125
JHCritical Rail Temperature speeds, (other than buckled rails)124
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)123
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)122