55 delay minutes
The biggest share (31%) of the delay picked up at Chafford Hundred in the four weeks to 9 December 2023 came from signal, points and power faults.
78% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | 6 | 11% | 8% | - |
| Signals, points and power | 17 | 31% | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | 2 | 4% | 7% | - |
| External | - | - | 4% | - |
| Network management | 13 | 24% | 17% | - |
| The operators' causes | ||||
| Train faults | 9 | 16% | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | 2 | 4% | 5% | - |
| Operator, other | 6 | 11% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 11 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 6 |
| MU | Depot operating problem | 6 |
| AC | Waiting Train preparation or completion of TOPS list/RT3973 | 4 |
| IH | Power Supply And Distribution System Failure | 4 |
| OK | Delay caused by Operating staff oversight, issues or absence (excluding signallers and Control) | 4 |
| QM | Train schedule/STP Process including erroneous simplifiers | 4 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 4 |
| M8 | Technical failures above the Solebar | 3 |
| FH | FOC Planning issue (not diagramming or rostering) | 2 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 351 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 261 |
| TG | Driver | 248 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 217 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 176 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 128 |
| QM | Train schedule/STP Process including erroneous simplifiers | 125 |
| JH | Critical Rail Temperature speeds, (other than buckled rails) | 124 |
| OK | Delay caused by Operating staff oversight, issues or absence (excluding signallers and Control) | 123 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 122 |