2,618 delay minutes

The biggest share (27%) of the delay picked up at Chesterfield in the four weeks to 9 December 2023 came from track faults.

56% of these minutes were knock-on from something that happened elsewhere first. 87% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track70927%8% 25 a day, the most in 5 years2
Signals, points and power28011%16% 10 a day, more than 3 of the other 4 years3
Weather and structures1245%7% 4 a day, more than 3 of the other 4 years5
Autumn25710%7% 9 a day, the most in 5 years2
External733%4% 3 a day, more than 1 of the other 4 years1
Network management55221%17% 20 a day, more than 2 of the other 4 years2
The operators' causes
Train faults2459%16% 9 a day, the least in 5 years2
Traincrew1325%11% 5 a day, more than 2 of the other 4 years1
Stations693%3% 2 a day, more than 3 of the other 4 years-
Operations893%5% 3 a day, the most in 5 years-
Operator, other893%7% 3 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.655
QJSpecial working for leaf-fall track circuit operation196
OUDelays not Investigated by Network Rail109
IHPower Supply And Distribution System Failure106
JKFlooding not due to exceptional weather84
I5Possession over-run from planned work64
TGDriver60
I6Delays as a result of line blocks / track patrols (including late handback)51
IBPoints failure (including no fault found)49
MCDiesel Loco failure, defect, attention46
Since 2018
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar5,350
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.5,292
TGDriver4,122
IBPoints failure (including no fault found)3,468
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure3,177
M8Technical failures above the Solebar3,101
OCSignaller including mis-routing (not ERTM /ETCS related)2,313
J3Axle Counter Failure2,178
IRBroken/cracked/twisted/buckled/flawed rail2,096
XPBRIDGE HIT2,020