Chesterfield
2,618 delay minutes
The biggest share (27%) of the delay picked up at Chesterfield in the four weeks to 9 December 2023 came from track faults.
56% of these minutes were knock-on from something that happened elsewhere first. 87% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 709 | 27% | 8% | 25 a day, the most in 5 years | 2 |
| Signals, points and power | 280 | 11% | 16% | 10 a day, more than 3 of the other 4 years | 3 |
| Weather and structures | 124 | 5% | 7% | 4 a day, more than 3 of the other 4 years | 5 |
| Autumn | 257 | 10% | 7% | 9 a day, the most in 5 years | 2 |
| External | 73 | 3% | 4% | 3 a day, more than 1 of the other 4 years | 1 |
| Network management | 552 | 21% | 17% | 20 a day, more than 2 of the other 4 years | 2 |
| The operators' causes | |||||
| Train faults | 245 | 9% | 16% | 9 a day, the least in 5 years | 2 |
| Traincrew | 132 | 5% | 11% | 5 a day, more than 2 of the other 4 years | 1 |
| Stations | 69 | 3% | 3% | 2 a day, more than 3 of the other 4 years | - |
| Operations | 89 | 3% | 5% | 3 a day, the most in 5 years | - |
| Operator, other | 89 | 3% | 7% | 3 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 655 |
| QJ | Special working for leaf-fall track circuit operation | 196 |
| OU | Delays not Investigated by Network Rail | 109 |
| IH | Power Supply And Distribution System Failure | 106 |
| JK | Flooding not due to exceptional weather | 84 |
| I5 | Possession over-run from planned work | 64 |
| TG | Driver | 60 |
| I6 | Delays as a result of line blocks / track patrols (including late handback) | 51 |
| IB | Points failure (including no fault found) | 49 |
| MC | Diesel Loco failure, defect, attention | 46 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 5,350 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 5,292 |
| TG | Driver | 4,122 |
| IB | Points failure (including no fault found) | 3,468 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 3,177 |
| M8 | Technical failures above the Solebar | 3,101 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 2,313 |
| J3 | Axle Counter Failure | 2,178 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 2,096 |
| XP | BRIDGE HIT | 2,020 |