1,094 delay minutes

The biggest share (25%) of the delay picked up at Church Fenton in the four weeks to 9 December 2023 came from faulty trains.

85% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track626%8% 2 a day, more than 3 of the other 4 years-
Signals, points and power888%16% 3 a day, more than 2 of the other 4 years-
Weather and structures888%7% 3 a day, more than 3 of the other 4 years-
Autumn898%7% 3 a day, the most in 5 years-
External616%4% 2 a day, the most in 5 years-
Network management21420%17% 8 a day, more than 3 of the other 4 years4
The operators' causes
Train faults27025%16% 10 a day, the most in 5 years-
Traincrew11511%11% 4 a day, more than 3 of the other 4 years-
Stations283%3% 1 a day, more than 3 of the other 4 years-
Operations404%5% 1 a day, more than 3 of the other 4 years-
Operator, other404%7% 1 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MNBrake and brake systems faults; including wheel flats where no other cause had been identified140
OUDelays not Investigated by Network Rail82
QJSpecial working for leaf-fall track circuit operation57
TGDriver51
TH(Senior) Conductor/Train Manager50
MDTechnical failures below the solebar49
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail43
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.42
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)41
OCSignaller including mis-routing (not ERTM /ETCS related)33
Since 2018
CodeWhat Network Rail loggedMinutes
JATSR speed restrictions for track work outside of the Timetable Planning Rules2,809
TGDriver2,185
MDTechnical failures below the solebar1,787
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,191
M8Technical failures above the Solebar1,163
ICTrack circuit failure (including no fault found)1,111
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.977
TH(Senior) Conductor/Train Manager962
MNBrake and brake systems faults; including wheel flats where no other cause had been identified955
OCSignaller including mis-routing (not ERTM /ETCS related)944