Chingford
219 delay minutes
The biggest share (28%) of the delay picked up at Chingford in the four weeks to 9 December 2023 came from faulty trains.
46% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 9 | 4% | 8% | 0 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 15 | 7% | 16% | 1 a day, more than 2 of the other 4 years | 7 |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | - | - | 7% | 0 a day, the least in 5 years | - |
| External | 57 | 26% | 4% | 2 a day, the most in 5 years | 9 |
| Network management | 25 | 11% | 17% | 1 a day, the most in 5 years | 1 |
| The operators' causes | |||||
| Train faults | 62 | 28% | 16% | 2 a day, more than 1 of the other 4 years | 6 |
| Traincrew | 29 | 13% | 11% | 1 a day, more than 2 of the other 4 years | 4 |
| Stations | 8 | 4% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 14 | 6% | 5% | 1 a day, more than 2 of the other 4 years | - |
| Operator, other | - | - | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XP | BRIDGE HIT | 54 |
| TG | Driver | 29 |
| I2 | AC/DC trip (including no fault or cause found) | 15 |
| MD | Technical failures below the solebar | 14 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 14 |
| MY | Coupler, Coupler system and Jumper cable faults | 13 |
| M7 | Door and Door system faults | 11 |
| MU | Depot operating problem | 11 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 10 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 10 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 2,615 |
| M7 | Door and Door system faults | 1,192 |
| MD | Technical failures below the solebar | 941 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 835 |
| M8 | Technical failures above the Solebar | 826 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 650 |
| IH | Power Supply And Distribution System Failure | 498 |
| MU | Depot operating problem | 482 |
| XP | BRIDGE HIT | 468 |
| MY | Coupler, Coupler system and Jumper cable faults | 462 |