Cheshunt
828 delay minutes
The biggest share (27%) of the delay picked up at Cheshunt in the four weeks to 9 December 2023 came from how the network was run.
65% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 24 | 3% | 8% | 1 a day, the least in 5 years | - |
| Signals, points and power | 91 | 11% | 16% | 3 a day, more than 2 of the other 4 years | 4 |
| Weather and structures | 11 | 1% | 7% | 0 a day, more than 3 of the other 4 years | - |
| Autumn | 18 | 2% | 7% | 1 a day, more than 2 of the other 4 years | - |
| External | 150 | 18% | 4% | 5 a day, the most in 5 years | 4 |
| Network management | 223 | 27% | 17% | 8 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 102 | 12% | 16% | 4 a day, the least in 5 years | 3 |
| Traincrew | 9 | 1% | 11% | 0 a day, the least in 5 years | 3 |
| Stations | 28 | 3% | 3% | 1 a day, more than 2 of the other 4 years | - |
| Operations | 63 | 8% | 5% | 2 a day, the most in 5 years | - |
| Operator, other | 110 | 13% | 7% | 4 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XP | BRIDGE HIT | 133 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 100 |
| I2 | AC/DC trip (including no fault or cause found) | 88 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 78 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 63 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 57 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 31 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 27 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 20 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 20 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 4,088 |
| TG | Driver | 3,202 |
| MD | Technical failures below the solebar | 3,015 |
| M8 | Technical failures above the Solebar | 2,367 |
| M7 | Door and Door system faults | 2,205 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,960 |
| IB | Points failure (including no fault found) | 1,948 |
| RB | Passengers joining/alighting | 1,884 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 1,708 |
| XD | Level Crossing Incidents including misuse and emergency services being prioritised over rail services | 1,592 |