Cheadle Hulme
2,134 delay minutes
The biggest share (18%) of the delay picked up at Cheadle Hulme in the four weeks to 9 December 2023 came from how the network was run.
74% of these minutes were knock-on from something that happened elsewhere first. 82% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 136 | 6% | 8% | 5 a day, the most in 5 years | - |
| Signals, points and power | 301 | 14% | 16% | 11 a day, the most in 5 years | - |
| Weather and structures | 136 | 6% | 7% | 5 a day, the most in 5 years | - |
| Autumn | 172 | 8% | 7% | 6 a day, more than 1 of the other 4 years | - |
| External | 66 | 3% | 4% | 2 a day, the most in 5 years | - |
| Network management | 386 | 18% | 17% | 14 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 340 | 16% | 16% | 12 a day, more than 2 of the other 4 years | 1 |
| Traincrew | 156 | 7% | 11% | 6 a day, more than 3 of the other 4 years | - |
| Stations | 66 | 3% | 3% | 2 a day, more than 1 of the other 4 years | - |
| Operations | 120 | 6% | 5% | 4 a day, the most in 5 years | - |
| Operator, other | 256 | 12% | 7% | 9 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OU | Delays not Investigated by Network Rail | 152 |
| TG | Driver | 124 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 114 |
| Q3 | NZ Pumps T | 111 |
| TT | Leaf fall Neutral | 101 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 97 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 96 |
| IB | Points failure (including no fault found) | 84 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 72 |
| M7 | Door and Door system faults | 64 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 3,742 |
| MD | Technical failures below the solebar | 3,142 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 3,116 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,768 |
| IC | Track circuit failure (including no fault found) | 2,590 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2,589 |
| IA | Signal failure (including no fault found) | 2,472 |
| IB | Points failure (including no fault found) | 2,227 |
| M8 | Technical failures above the Solebar | 2,128 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 1,826 |