Chalkwell
21 delay minutes
The biggest share (33%) of the delay picked up at Chalkwell in the four weeks to 9 December 2023 came from traincrew problems.
0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | 7 | 33% | 11% | - |
| Stations | 5 | 24% | 3% | - |
| Operations | 5 | 24% | 5% | - |
| Operator, other | 4 | 19% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| RP | Passenger dropped object whilst boarding/alighting from train and train delayed at TOC request | 5 |
| TZ | Other Passenger Train Operating Company causes | 5 |
| TG | Driver | 4 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 4 |
| TW | Driver adhering to company professional driving standards or policy | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 281 |
| TW | Driver adhering to company professional driving standards or policy | 274 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 193 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 188 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 151 |
| TG | Driver | 126 |
| I2 | AC/DC trip (including no fault or cause found) | 118 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 107 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 89 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 72 |