6,073 delay minutes

The biggest share (25%) of the delay picked up at London Charing Cross in the four weeks to 9 December 2023 came from faulty trains.

92% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track2214%8% 8 a day, more than 2 of the other 4 years-
Signals, points and power5419%16% 19 a day, more than 1 of the other 4 years2
Weather and structures31<1%7% 1 a day, more than 3 of the other 4 years1
Autumn68011%7% 24 a day, the most in 5 years3
External2083%4% 7 a day, the most in 5 years2
Network management82114%17% 29 a day, more than 3 of the other 4 years10
The operators' causes
Train faults1,50225%16% 54 a day, the most in 5 years39
Traincrew4207%11% 15 a day, more than 3 of the other 4 years4
Stations1162%3% 4 a day, more than 1 of the other 4 years-
Operations911%5% 3 a day, the least in 5 years2
Operator, other1,44324%7% 52 a day, more than 3 of the other 4 years2

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
VHPassenger Communication cord, door egress or emergency train alarm operated688
Q3NZ Pumps T652
TTLeaf fall Neutral639
MNBrake and brake systems faults; including wheel flats where no other cause had been identified593
TGDriver349
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)230
M7Door and Door system faults223
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.169
XPBRIDGE HIT164
M0Confirmed train cab based safety system fault (including GSMR)162
Since 2018
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)17,596
IBPoints failure (including no fault found)16,477
TGDriver14,944
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)11,939
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure10,904
VHPassenger Communication cord, door egress or emergency train alarm operated10,651
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.10,006
IRBroken/cracked/twisted/buckled/flawed rail7,810
MDTechnical failures below the solebar6,896
M0Confirmed train cab based safety system fault (including GSMR)6,658