10 delay minutes

Most of the delay picked up at Chertsey in the four weeks to 9 December 2023 came from problems at stations.

0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations660%3%-
Operations--5%-
Operator, other440%7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
T2Delay at unstaffed station to non-DOO train6
VHPassenger Communication cord, door egress or emergency train alarm operated4
Since 2018
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)615
J3Axle Counter Failure366
T2Delay at unstaffed station to non-DOO train301
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure287
VHPassenger Communication cord, door egress or emergency train alarm operated145
IBPoints failure (including no fault found)126
I6Delays as a result of line blocks / track patrols (including late handback)86
TGDriver83
IHPower Supply And Distribution System Failure81
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)77