Chertsey
10 delay minutes
Most of the delay picked up at Chertsey in the four weeks to 9 December 2023 came from problems at stations.
0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | 6 | 60% | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | 4 | 40% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| T2 | Delay at unstaffed station to non-DOO train | 6 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 615 |
| J3 | Axle Counter Failure | 366 |
| T2 | Delay at unstaffed station to non-DOO train | 301 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 287 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 145 |
| IB | Points failure (including no fault found) | 126 |
| I6 | Delays as a result of line blocks / track patrols (including late handback) | 86 |
| TG | Driver | 83 |
| IH | Power Supply And Distribution System Failure | 81 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 77 |