Chislehurst
481 delay minutes
The biggest share (43%) of the delay picked up at Chislehurst in the four weeks to 9 December 2023 came from how the network was run.
63% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 68 | 14% | 8% | 2 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 18 | 4% | 16% | 1 a day, the least in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 25 | 5% | 7% | 1 a day, more than 1 of the other 4 years | - |
| External | 9 | 2% | 4% | 0 a day, the least in 5 years | - |
| Network management | 205 | 43% | 17% | 7 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 60 | 12% | 16% | 2 a day, the most in 5 years | - |
| Traincrew | 13 | 3% | 11% | 0 a day, the least in 5 years | - |
| Stations | 6 | 1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 4 | <1% | 5% | 0 a day, more than 1 of the other 4 years | - |
| Operator, other | 73 | 15% | 7% | 3 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 69 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 67 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 57 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 34 |
| OD | Delays due to National/Regional/Route Operations directives or Route Control decision or directive | 30 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 27 |
| Q3 | NZ Pumps T | 25 |
| TT | Leaf fall Neutral | 25 |
| OB | Delayed by signaller not applying applicable regulating policy | 13 |
| TG | Driver | 13 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JS | Condition of Track TSR outside the Timetable Planning Rules | 6,369 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 4,151 |
| IB | Points failure (including no fault found) | 1,985 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 1,762 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,748 |
| IC | Track circuit failure (including no fault found) | 1,628 |
| TG | Driver | 1,416 |
| XP | BRIDGE HIT | 960 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 895 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 660 |