Crewkerne
0 delay minutes
No delay was picked up at Crewkerne in the four weeks to 9 December 2023.
100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Nothing logged. | ||
| Code | What Network Rail logged | Minutes |
|---|---|---|
| RM | Waiting connections from other transport modes | 134 |
| TI | Traincrew rostering problem | 46 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 23 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 22 |
| J4 | Infrastructure Safety Issue Reported by Member of the Public - No Fault Found | 22 |
| J3 | Axle Counter Failure | 18 |
| TZ | Other Passenger Train Operating Company causes | 13 |
| QH | Adhesion problems due to leaf contamination | 12 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 10 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 10 |