Clandon
319 delay minutes
The biggest share (27%) of the delay picked up at Clandon in the four weeks to 9 December 2023 came from track faults.
87% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 85 | 27% | 8% | 3 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 23 | 7% | 16% | 1 a day, more than 2 of the other 4 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 41 | 13% | 7% | 1 a day, more than 2 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 45 | 14% | 17% | 2 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 20 | 6% | 16% | 1 a day, more than 2 of the other 4 years | - |
| Traincrew | 55 | 17% | 11% | 2 a day, more than 3 of the other 4 years | - |
| Stations | 2 | <1% | 3% | 0 a day, the least in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 48 | 15% | 7% | 2 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IR | Broken/cracked/twisted/buckled/flawed rail | 73 |
| Q3 | NZ Pumps T | 41 |
| TG | Driver | 41 |
| TT | Leaf fall Neutral | 41 |
| IB | Points failure (including no fault found) | 20 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 16 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 12 |
| M7 | Door and Door system faults | 8 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 7 |
| MD | Technical failures below the solebar | 7 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 4,216 |
| IC | Track circuit failure (including no fault found) | 2,112 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,154 |
| TG | Driver | 1,078 |
| XP | BRIDGE HIT | 503 |
| MD | Technical failures below the solebar | 469 |
| IT | Rough ride or bumps reported - cause not known or no fault found | 437 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 394 |
| TH | (Senior) Conductor/Train Manager | 338 |
| TT | Leaf fall Neutral | 335 |