Castle Cary
1,190 delay minutes
The biggest share (30%) of the delay picked up at Castle Cary in the four weeks to 9 December 2023 came from signal, points and power faults.
44% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 106 | 9% | 8% | 4 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 355 | 30% | 16% | 13 a day, the most in 5 years | - |
| Weather and structures | 217 | 18% | 7% | 8 a day, the most in 5 years | - |
| Autumn | 78 | 7% | 7% | 3 a day, more than 3 of the other 4 years | - |
| External | 35 | 3% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 130 | 11% | 17% | 5 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 119 | 10% | 16% | 4 a day, more than 3 of the other 4 years | - |
| Traincrew | 102 | 9% | 11% | 4 a day, the most in 5 years | - |
| Stations | 10 | <1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 17 | 1% | 5% | 1 a day, more than 3 of the other 4 years | - |
| Operator, other | 22 | 2% | 7% | 1 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IA | Signal failure (including no fault found) | 165 |
| JK | Flooding not due to exceptional weather | 144 |
| IB | Points failure (including no fault found) | 102 |
| OU | Delays not Investigated by Network Rail | 71 |
| TG | Driver | 69 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 62 |
| IC | Track circuit failure (including no fault found) | 52 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 48 |
| QH | Adhesion problems due to leaf contamination | 40 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 31 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 2,546 |
| JH | Critical Rail Temperature speeds, (other than buckled rails) | 2,404 |
| IC | Track circuit failure (including no fault found) | 2,316 |
| IA | Signal failure (including no fault found) | 2,059 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 1,996 |
| MD | Technical failures below the solebar | 1,905 |
| TG | Driver | 1,740 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,738 |
| IQ | Trackside sign blown down, fallen over, missing, defective, mis-placed | 1,464 |
| ZU | No Cause Identified After investigation by both Parties | 1,164 |