Leaves on the Line

Castle Cary

CLC Western route
CSV JSON

1,190 delay minutes

The biggest share (30%) of the delay picked up at Castle Cary in the four weeks to 9 December 2023 came from signal, points and power faults.

44% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1069%8% 4 a day, more than 3 of the other 4 years-
Signals, points and power35530%16% 13 a day, the most in 5 years-
Weather and structures21718%7% 8 a day, the most in 5 years-
Autumn787%7% 3 a day, more than 3 of the other 4 years-
External353%4% 1 a day, more than 3 of the other 4 years-
Network management13011%17% 5 a day, more than 3 of the other 4 years-
The operators' causes
Train faults11910%16% 4 a day, more than 3 of the other 4 years-
Traincrew1029%11% 4 a day, the most in 5 years-
Stations10<1%3% 0 a day, more than 1 of the other 4 years-
Operations171%5% 1 a day, more than 3 of the other 4 years-
Operator, other222%7% 1 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IASignal failure (including no fault found)165
JKFlooding not due to exceptional weather144
IBPoints failure (including no fault found)102
OUDelays not Investigated by Network Rail71
TGDriver69
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.62
ICTrack circuit failure (including no fault found)52
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions48
QHAdhesion problems due to leaf contamination40
MNBrake and brake systems faults; including wheel flats where no other cause had been identified31
Since 2018
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)2,546
JHCritical Rail Temperature speeds, (other than buckled rails)2,404
ICTrack circuit failure (including no fault found)2,316
IASignal failure (including no fault found)2,059
JSCondition of Track TSR outside the Timetable Planning Rules1,996
MDTechnical failures below the solebar1,905
TGDriver1,740
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,738
IQTrackside sign blown down, fallen over, missing, defective, mis-placed1,464
ZUNo Cause Identified After investigation by both Parties1,164