Leaves on the Line

Cleethorpes

CLE North & East route
CSV JSON

1,046 delay minutes

The biggest share (21%) of the delay picked up at Cleethorpes in the four weeks to 9 December 2023 came from autumn leaves.

77% of these minutes were knock-on from something that happened elsewhere first. 87% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track505%8% 2 a day, more than 2 of the other 4 years-
Signals, points and power12512%16% 4 a day, more than 2 of the other 4 years-
Weather and structures111%7% 0 a day, more than 1 of the other 4 years-
Autumn22121%7% 8 a day, the most in 5 years1
External14214%4% 5 a day, the most in 5 years2
Network management17216%17% 6 a day, more than 3 of the other 4 years32
The operators' causes
Train faults616%16% 2 a day, more than 2 of the other 4 years4
Traincrew15315%11% 5 a day, the most in 5 years3
Stations8<1%3% 0 a day, more than 1 of the other 4 years-
Operations222%5% 1 a day, more than 3 of the other 4 years1
Operator, other828%7% 3 a day, the most in 5 years2

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
QJSpecial working for leaf-fall track circuit operation164
TGDriver115
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)108
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)75
IBPoints failure (including no fault found)69
Q3NZ Pumps T50
I5Possession over-run from planned work44
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.39
MPRail / wheel interface, adhesion problems (including ice on the running rail)34
XPBRIDGE HIT34
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver3,487
MDTechnical failures below the solebar1,816
M8Technical failures above the Solebar1,699
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles1,582
TH(Senior) Conductor/Train Manager1,281
M7Door and Door system faults1,084
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,015
IBPoints failure (including no fault found)951
MNBrake and brake systems faults; including wheel flats where no other cause had been identified932
OCSignaller including mis-routing (not ERTM /ETCS related)799