Cleethorpes
1,046 delay minutes
The biggest share (21%) of the delay picked up at Cleethorpes in the four weeks to 9 December 2023 came from autumn leaves.
77% of these minutes were knock-on from something that happened elsewhere first. 87% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 50 | 5% | 8% | 2 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 125 | 12% | 16% | 4 a day, more than 2 of the other 4 years | - |
| Weather and structures | 11 | 1% | 7% | 0 a day, more than 1 of the other 4 years | - |
| Autumn | 221 | 21% | 7% | 8 a day, the most in 5 years | 1 |
| External | 142 | 14% | 4% | 5 a day, the most in 5 years | 2 |
| Network management | 172 | 16% | 17% | 6 a day, more than 3 of the other 4 years | 32 |
| The operators' causes | |||||
| Train faults | 61 | 6% | 16% | 2 a day, more than 2 of the other 4 years | 4 |
| Traincrew | 153 | 15% | 11% | 5 a day, the most in 5 years | 3 |
| Stations | 8 | <1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 22 | 2% | 5% | 1 a day, more than 3 of the other 4 years | 1 |
| Operator, other | 82 | 8% | 7% | 3 a day, the most in 5 years | 2 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QJ | Special working for leaf-fall track circuit operation | 164 |
| TG | Driver | 115 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 108 |
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 75 |
| IB | Points failure (including no fault found) | 69 |
| Q3 | NZ Pumps T | 50 |
| I5 | Possession over-run from planned work | 44 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 39 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 34 |
| XP | BRIDGE HIT | 34 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 3,487 |
| MD | Technical failures below the solebar | 1,816 |
| M8 | Technical failures above the Solebar | 1,699 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 1,582 |
| TH | (Senior) Conductor/Train Manager | 1,281 |
| M7 | Door and Door system faults | 1,084 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,015 |
| IB | Points failure (including no fault found) | 951 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 932 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 799 |