788 delay minutes

The biggest share (27%) of the delay picked up at Claygate in the four weeks to 9 December 2023 came from autumn leaves.

76% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track233%8% 1 a day, more than 2 of the other 4 years-
Signals, points and power496%16% 2 a day, more than 2 of the other 4 years-
Weather and structures354%7% 1 a day, the most in 5 years-
Autumn21227%7% 8 a day, the most in 5 years-
External--4% 0 a day, the least in 5 years-
Network management19625%17% 7 a day, more than 3 of the other 4 years-
The operators' causes
Train faults263%16% 1 a day, more than 1 of the other 4 years-
Traincrew395%11% 1 a day, more than 3 of the other 4 years-
Stations142%3% 1 a day, more than 1 of the other 4 years-
Operations101%5% 0 a day, the most in 5 years-
Operator, other18423%7% 7 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T178
TTLeaf fall Neutral178
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)94
IBPoints failure (including no fault found)40
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)35
OCSignaller including mis-routing (not ERTM /ETCS related)34
OBDelayed by signaller not applying applicable regulating policy24
QICautioning due to railhead leaf contamination23
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident19
I5Possession over-run from planned work18
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.4,140
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,125
TTLeaf fall Neutral1,167
ICTrack circuit failure (including no fault found)916
OCSignaller including mis-routing (not ERTM /ETCS related)794
Q3NZ Pumps T721
TGDriver699
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure689
T2Delay at unstaffed station to non-DOO train672
MDTechnical failures below the solebar446