Clitheroe
760 delay minutes
The biggest share (28%) of the delay picked up at Clitheroe in the four weeks to 9 December 2023 came from outside causes like vandalism, cable theft, animals and fires.
53% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 3 | <1% | 8% | 0 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 51 | 7% | 16% | 2 a day, more than 3 of the other 4 years | - |
| Weather and structures | 3 | <1% | 7% | 0 a day, more than 1 of the other 4 years | - |
| Autumn | 164 | 22% | 7% | 6 a day, the most in 5 years | - |
| External | 212 | 28% | 4% | 8 a day, the most in 5 years | 1 |
| Network management | 96 | 13% | 17% | 3 a day, more than 1 of the other 4 years | 21 |
| The operators' causes | |||||
| Train faults | 75 | 10% | 16% | 3 a day, more than 1 of the other 4 years | 1 |
| Traincrew | 14 | 2% | 11% | 1 a day, the least in 5 years | 6 |
| Stations | 11 | 1% | 3% | 0 a day, more than 3 of the other 4 years | - |
| Operations | 63 | 8% | 5% | 2 a day, more than 3 of the other 4 years | 1 |
| Operator, other | 69 | 9% | 7% | 2 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 190 |
| QI | Cautioning due to railhead leaf contamination | 77 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 46 |
| TZ | Other Passenger Train Operating Company causes | 46 |
| Q3 | NZ Pumps T | 44 |
| OE | Failure to lay Sandite or operate Railhead Conditioning train as programmed | 43 |
| OK | Delay caused by Operating staff oversight, issues or absence (excluding signallers and Control) | 33 |
| MD | Technical failures below the solebar | 29 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 24 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 18 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 1,807 |
| TG | Driver | 1,389 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 868 |
| TH | (Senior) Conductor/Train Manager | 663 |
| IC | Track circuit failure (including no fault found) | 639 |
| M7 | Door and Door system faults | 544 |
| Q3 | NZ Pumps T | 543 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 537 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 471 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 467 |