Chinley
8 delay minutes
Most of the delay picked up at Chinley in the four weeks to 9 December 2023 came from traincrew problems.
100% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | 8 | 100% | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | 1 |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 8 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MU | Depot operating problem | 180 |
| TG | Driver | 151 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 106 |
| JK | Flooding not due to exceptional weather | 74 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 68 |
| M7 | Door and Door system faults | 41 |
| I5 | Possession over-run from planned work | 40 |
| TI | Traincrew rostering problem | 34 |
| M9 | Reported fleet equipment defect - no fault found | 34 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 34 |