Cambridge North
93 delay minutes
The biggest share (25%) of the delay picked up at Cambridge North in the four weeks to 9 December 2023 came from signal, points and power faults.
88% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 12 | 13% | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 23 | 25% | 16% | 1 a day, more than 2 of the other 4 years | - |
| Weather and structures | 11 | 12% | 7% | 0 a day, more than 3 of the other 4 years | - |
| Autumn | 6 | 6% | 7% | 0 a day, more than 2 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 5 | 5% | 17% | 0 a day, the least in 5 years | 2 |
| The operators' causes | |||||
| Train faults | 12 | 13% | 16% | 0 a day, more than 2 of the other 4 years | 1 |
| Traincrew | 5 | 5% | 11% | 0 a day, more than 1 of the other 4 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | 11 | 12% | 5% | 0 a day, more than 2 of the other 4 years | - |
| Operator, other | 8 | 9% | 7% | 0 a day, more than 1 of the other 4 years | 2 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 15 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 12 |
| T8 | Delays at Station believed to be operator cause and Information required from operator (Ops responsibility) | 11 |
| MU | Depot operating problem | 9 |
| QJ | Special working for leaf-fall track circuit operation | 6 |
| X9 | Points failure caused by severe snow or ice where heaters are fitted and working as designed | 6 |
| I1 | Overhead line/third rail defect | 5 |
| VZ | Other passenger or external causes the responsibility of TOC | 5 |
| IB | Points failure (including no fault found) | 3 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,368 |
| TG | Driver | 1,056 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 464 |
| IC | Track circuit failure (including no fault found) | 455 |
| M8 | Technical failures above the Solebar | 426 |
| I1 | Overhead line/third rail defect | 419 |
| TI | Traincrew rostering problem | 396 |
| MD | Technical failures below the solebar | 325 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 289 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 202 |