Leaves on the Line

Cambridge North

CMB Anglia route
CSV JSON

93 delay minutes

The biggest share (25%) of the delay picked up at Cambridge North in the four weeks to 9 December 2023 came from signal, points and power faults.

88% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1213%8% 0 a day, the least in 5 years-
Signals, points and power2325%16% 1 a day, more than 2 of the other 4 years-
Weather and structures1112%7% 0 a day, more than 3 of the other 4 years-
Autumn66%7% 0 a day, more than 2 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management55%17% 0 a day, the least in 5 years2
The operators' causes
Train faults1213%16% 0 a day, more than 2 of the other 4 years1
Traincrew55%11% 0 a day, more than 1 of the other 4 years-
Stations--3% 0 a day, the least in 5 years-
Operations1112%5% 0 a day, more than 2 of the other 4 years-
Operator, other89%7% 0 a day, more than 1 of the other 4 years2

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure15
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.12
T8Delays at Station believed to be operator cause and Information required from operator (Ops responsibility)11
MUDepot operating problem9
QJSpecial working for leaf-fall track circuit operation6
X9Points failure caused by severe snow or ice where heaters are fitted and working as designed6
I1Overhead line/third rail defect5
VZOther passenger or external causes the responsibility of TOC5
IBPoints failure (including no fault found)3
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)3
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,368
TGDriver1,056
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure464
ICTrack circuit failure (including no fault found)455
M8Technical failures above the Solebar426
I1Overhead line/third rail defect419
TITraincrew rostering problem396
MDTechnical failures below the solebar325
OCSignaller including mis-routing (not ERTM /ETCS related)289
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)202