12 delay minutes

Most of the delay picked up at Carnforth in the four weeks to 9 December 2023 came from weather and structures.

100% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures12100%7%-
Autumn--7%-
External--4%-
Network management--17%3
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
JKFlooding not due to exceptional weather12
Since 2018
CodeWhat Network Rail loggedMinutes
IESignalling Functional Power Supply Failure147
MDTechnical failures below the solebar53
I1Overhead line/third rail defect50
I8Animal Strike or Incursion within the control of Network Rail50
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail46
I5Possession over-run from planned work28
TZOther Passenger Train Operating Company causes26
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)20
IGBlock failure18
XRCable vandalism or theft17