0 delay minutes

No delay was picked up at Canonbury in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%1
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)246
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)235
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards118
I5Possession over-run from planned work101
J3Axle Counter Failure89
MCDiesel Loco failure, defect, attention53
MLWagons, coaches and parcel vehicle faults50
MNBrake and brake systems faults; including wheel flats where no other cause had been identified38
XBVandalism or theft (including the placing of objects on the line)36