Colchester
667 delay minutes
The biggest share (39%) of the delay picked up at Colchester in the four weeks to 9 December 2023 came from signal, points and power faults.
40% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 20 | 3% | 8% | 1 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 261 | 39% | 16% | 9 a day, more than 3 of the other 4 years | 2 |
| Weather and structures | 85 | 13% | 7% | 3 a day, more than 3 of the other 4 years | - |
| Autumn | 19 | 3% | 7% | 1 a day, more than 1 of the other 4 years | - |
| External | 17 | 3% | 4% | 1 a day, the least in 5 years | 1 |
| Network management | 84 | 13% | 17% | 3 a day, the least in 5 years | 1 |
| The operators' causes | |||||
| Train faults | 97 | 15% | 16% | 3 a day, the least in 5 years | 3 |
| Traincrew | 42 | 6% | 11% | 2 a day, the least in 5 years | 1 |
| Stations | 6 | <1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 7 | 1% | 5% | 0 a day, the least in 5 years | 1 |
| Operator, other | 29 | 4% | 7% | 1 a day, the least in 5 years | 4 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IA | Signal failure (including no fault found) | 158 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 85 |
| IE | Signalling Functional Power Supply Failure | 56 |
| M8 | Technical failures above the Solebar | 55 |
| OM | Technical failure associated with a Railhead conditioning train | 24 |
| TG | Driver | 22 |
| Q3 | NZ Pumps T | 19 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 17 |
| XP | BRIDGE HIT | 17 |
| TI | Traincrew rostering problem | 16 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 4,366 |
| MD | Technical failures below the solebar | 3,893 |
| TG | Driver | 3,720 |
| M8 | Technical failures above the Solebar | 3,260 |
| M7 | Door and Door system faults | 2,339 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 2,015 |
| IB | Points failure (including no fault found) | 1,979 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,714 |
| I1 | Overhead line/third rail defect | 1,570 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 1,557 |