Coventry
3,962 delay minutes
The biggest share (18%) of the delay picked up at Coventry in the four weeks to 9 December 2023 came from how the network was run.
64% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 189 | 5% | 8% | 7 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 624 | 16% | 16% | 22 a day, more than 3 of the other 4 years | 2 |
| Weather and structures | 76 | 2% | 7% | 3 a day, the least in 5 years | - |
| Autumn | 358 | 9% | 7% | 13 a day, the most in 5 years | - |
| External | 96 | 2% | 4% | 3 a day, the most in 5 years | - |
| Network management | 732 | 18% | 17% | 26 a day, more than 3 of the other 4 years | 8 |
| The operators' causes | |||||
| Train faults | 543 | 14% | 16% | 19 a day, more than 3 of the other 4 years | 2 |
| Traincrew | 429 | 11% | 11% | 15 a day, the least in 5 years | 10 |
| Stations | 152 | 4% | 3% | 5 a day, more than 1 of the other 4 years | - |
| Operations | 116 | 3% | 5% | 4 a day, more than 3 of the other 4 years | 4 |
| Operator, other | 649 | 16% | 7% | 23 a day, more than 3 of the other 4 years | 2 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 345 |
| IB | Points failure (including no fault found) | 257 |
| Q3 | NZ Pumps T | 249 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 219 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 203 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 161 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 158 |
| IH | Power Supply And Distribution System Failure | 153 |
| TT | Leaf fall Neutral | 151 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 117 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 15,247 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 8,436 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 7,551 |
| J3 | Axle Counter Failure | 7,246 |
| TH | (Senior) Conductor/Train Manager | 7,014 |
| IB | Points failure (including no fault found) | 6,884 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 5,878 |
| MD | Technical failures below the solebar | 5,229 |
| M8 | Technical failures above the Solebar | 5,100 |
| ZU | No Cause Identified After investigation by both Parties | 4,489 |