Coryton
1,740 delay minutes
The biggest share (28%) of the delay picked up at Coryton in the four weeks to 9 December 2023 came from how the network was run.
76% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 115 | 7% | 8% | 4 a day, the most in 5 years | - |
| Signals, points and power | 152 | 9% | 16% | 5 a day, more than 3 of the other 4 years | - |
| Weather and structures | 8 | <1% | 7% | 0 a day, more than 2 of the other 4 years | - |
| Autumn | - | - | 7% | 0 a day, the least in 5 years | - |
| External | 11 | <1% | 4% | 0 a day, more than 2 of the other 4 years | - |
| Network management | 486 | 28% | 17% | 17 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 318 | 18% | 16% | 11 a day, more than 1 of the other 4 years | 21 |
| Traincrew | 164 | 9% | 11% | 6 a day, more than 1 of the other 4 years | - |
| Stations | 123 | 7% | 3% | 4 a day, more than 1 of the other 4 years | - |
| Operations | 328 | 19% | 5% | 12 a day, the most in 5 years | - |
| Operator, other | 35 | 2% | 7% | 1 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 355 |
| TZ | Other Passenger Train Operating Company causes | 321 |
| J3 | Axle Counter Failure | 138 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 122 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 115 |
| T2 | Delay at unstaffed station to non-DOO train | 110 |
| T3 | Waiting connections from other transport modes | 82 |
| MU | Depot operating problem | 80 |
| TG | Driver | 52 |
| M8 | Technical failures above the Solebar | 42 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 8,971 |
| T2 | Delay at unstaffed station to non-DOO train | 5,073 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 3,686 |
| TG | Driver | 3,142 |
| TH | (Senior) Conductor/Train Manager | 2,751 |
| MD | Technical failures below the solebar | 2,352 |
| OU | Delays not Investigated by Network Rail | 2,184 |
| M8 | Technical failures above the Solebar | 2,088 |
| ZY | Univestigated station overtime System Roll-up Only | 2,015 |
| MU | Depot operating problem | 1,603 |