Caerphilly
1,301 delay minutes
The biggest share (44%) of the delay picked up at Caerphilly in the four weeks to 9 December 2023 came from the operators' own operations.
29% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 5 | <1% | 8% | 0 a day, more than 3 of the other 4 years | 1 |
| Signals, points and power | 64 | 5% | 16% | 2 a day, the most in 5 years | 4 |
| Weather and structures | 9 | <1% | 7% | 0 a day, more than 3 of the other 4 years | - |
| Autumn | 35 | 3% | 7% | 1 a day, the least in 5 years | - |
| External | 28 | 2% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 156 | 12% | 17% | 6 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 148 | 11% | 16% | 5 a day, more than 1 of the other 4 years | 2 |
| Traincrew | 143 | 11% | 11% | 5 a day, more than 2 of the other 4 years | 4 |
| Stations | 135 | 10% | 3% | 5 a day, more than 2 of the other 4 years | - |
| Operations | 572 | 44% | 5% | 20 a day, the most in 5 years | - |
| Operator, other | 6 | <1% | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TZ | Other Passenger Train Operating Company causes | 572 |
| T2 | Delay at unstaffed station to non-DOO train | 120 |
| TG | Driver | 106 |
| J5 | Infrastructure Asset fault reported but proven to be mistaken | 92 |
| J3 | Axle Counter Failure | 60 |
| MD | Technical failures below the solebar | 41 |
| M9 | Reported fleet equipment defect - no fault found | 37 |
| M8 | Technical failures above the Solebar | 29 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 28 |
| QH | Adhesion problems due to leaf contamination | 27 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| T2 | Delay at unstaffed station to non-DOO train | 4,302 |
| TH | (Senior) Conductor/Train Manager | 2,080 |
| TG | Driver | 2,068 |
| MD | Technical failures below the solebar | 1,903 |
| M8 | Technical failures above the Solebar | 1,776 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 1,384 |
| TZ | Other Passenger Train Operating Company causes | 1,271 |
| J3 | Axle Counter Failure | 1,211 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 929 |
| M9 | Reported fleet equipment defect - no fault found | 850 |