Crewe
10,619 delay minutes
The biggest share (25%) of the delay picked up at Crewe in the four weeks to 9 December 2023 came from faulty trains.
63% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 137 | 1% | 8% | 5 a day, the least in 5 years | - |
| Signals, points and power | 1,772 | 17% | 16% | 63 a day, more than 3 of the other 4 years | 29 |
| Weather and structures | 503 | 5% | 7% | 18 a day, more than 2 of the other 4 years | 8 |
| Autumn | 294 | 3% | 7% | 10 a day, the most in 5 years | 1 |
| External | 217 | 2% | 4% | 8 a day, more than 2 of the other 4 years | 1 |
| Network management | 1,622 | 15% | 17% | 58 a day, the most in 5 years | 167 |
| The operators' causes | |||||
| Train faults | 2,654 | 25% | 16% | 95 a day, the most in 5 years | 48 |
| Traincrew | 2,064 | 19% | 11% | 74 a day, the most in 5 years | 112 |
| Stations | 417 | 4% | 3% | 15 a day, the most in 5 years | - |
| Operations | 429 | 4% | 5% | 15 a day, more than 3 of the other 4 years | 11 |
| Operator, other | 511 | 5% | 7% | 18 a day, the most in 5 years | 3 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 1,631 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 692 |
| IH | Power Supply And Distribution System Failure | 455 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 385 |
| M8 | Technical failures above the Solebar | 342 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 337 |
| IB | Points failure (including no fault found) | 296 |
| TZ | Other Passenger Train Operating Company causes | 270 |
| M9 | Reported fleet equipment defect - no fault found | 256 |
| MD | Technical failures below the solebar | 255 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 30,808 |
| M8 | Technical failures above the Solebar | 14,463 |
| MD | Technical failures below the solebar | 14,244 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 13,119 |
| TH | (Senior) Conductor/Train Manager | 12,031 |
| IB | Points failure (including no fault found) | 10,296 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 8,814 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 8,731 |
| I1 | Overhead line/third rail defect | 8,424 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 6,934 |