Cross Gates
5,155 delay minutes
The biggest share (19%) of the delay picked up at Cross Gates in the four weeks to 9 December 2023 came from how the network was run.
80% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 391 | 8% | 8% | 14 a day, the most in 5 years | - |
| Signals, points and power | 725 | 14% | 16% | 26 a day, the most in 5 years | - |
| Weather and structures | 505 | 10% | 7% | 18 a day, the most in 5 years | - |
| Autumn | 499 | 10% | 7% | 18 a day, the most in 5 years | - |
| External | 173 | 3% | 4% | 6 a day, the most in 5 years | - |
| Network management | 956 | 19% | 17% | 34 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 763 | 15% | 16% | 27 a day, the most in 5 years | - |
| Traincrew | 577 | 11% | 11% | 21 a day, the most in 5 years | - |
| Stations | 119 | 2% | 3% | 4 a day, the most in 5 years | - |
| Operations | 158 | 3% | 5% | 6 a day, the most in 5 years | - |
| Operator, other | 290 | 6% | 7% | 10 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OU | Delays not Investigated by Network Rail | 355 |
| TG | Driver | 314 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 257 |
| QJ | Special working for leaf-fall track circuit operation | 255 |
| II | Signalling lineside cable fault | 232 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 229 |
| TH | (Senior) Conductor/Train Manager | 189 |
| MD | Technical failures below the solebar | 180 |
| Q3 | NZ Pumps T | 167 |
| IC | Track circuit failure (including no fault found) | 151 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 4,151 |
| MD | Technical failures below the solebar | 2,196 |
| OU | Delays not Investigated by Network Rail | 1,715 |
| MU | Depot operating problem | 1,284 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,273 |
| TH | (Senior) Conductor/Train Manager | 1,268 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 1,193 |
| M8 | Technical failures above the Solebar | 1,148 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 1,094 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,077 |