5,155 delay minutes

The biggest share (19%) of the delay picked up at Cross Gates in the four weeks to 9 December 2023 came from how the network was run.

80% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track3918%8% 14 a day, the most in 5 years-
Signals, points and power72514%16% 26 a day, the most in 5 years-
Weather and structures50510%7% 18 a day, the most in 5 years-
Autumn49910%7% 18 a day, the most in 5 years-
External1733%4% 6 a day, the most in 5 years-
Network management95619%17% 34 a day, the most in 5 years-
The operators' causes
Train faults76315%16% 27 a day, the most in 5 years-
Traincrew57711%11% 21 a day, the most in 5 years-
Stations1192%3% 4 a day, the most in 5 years-
Operations1583%5% 6 a day, the most in 5 years-
Operator, other2906%7% 10 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
OUDelays not Investigated by Network Rail355
TGDriver314
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.257
QJSpecial working for leaf-fall track circuit operation255
IISignalling lineside cable fault232
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)229
TH(Senior) Conductor/Train Manager189
MDTechnical failures below the solebar180
Q3NZ Pumps T167
ICTrack circuit failure (including no fault found)151
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver4,151
MDTechnical failures below the solebar2,196
OUDelays not Investigated by Network Rail1,715
MUDepot operating problem1,284
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,273
TH(Senior) Conductor/Train Manager1,268
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)1,193
M8Technical failures above the Solebar1,148
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps1,094
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,077