Cricklewood
6 delay minutes
Most of the delay picked up at Cricklewood in the four weeks to 9 December 2023 came from other operator causes.
0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | 1 |
| Weather and structures | - | - | 7% | 1 |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | 6 | 100% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| V8 | Train striking or being struck by a bird | 6 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XL | Fire external to but directly affecting the network (incl. line blocks for emergency services attending off network incidents) | 27 |
| I6 | Delays as a result of line blocks / track patrols (including late handback) | 26 |
| XM | External utility incident including gas, water mains, overhead power lines | 25 |
| TI | Traincrew rostering problem | 19 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 17 |
| M8 | Technical failures above the Solebar | 12 |
| TZ | Other Passenger Train Operating Company causes | 10 |
| TG | Driver | 10 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 10 |
| R3 | Station Staff unavailable - missing or uncovered | 10 |