583 delay minutes

The biggest share (48%) of the delay picked up at Crayford in the four weeks to 9 December 2023 came from faulty trains.

90% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track183%8% 1 a day, more than 1 of the other 4 years-
Signals, points and power214%16% 1 a day, the least in 5 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn285%7% 1 a day, more than 1 of the other 4 years-
External5<1%4% 0 a day, the least in 5 years-
Network management13824%17% 5 a day, the least in 5 years1
The operators' causes
Train faults27848%16% 10 a day, the most in 5 years1
Traincrew142%11% 1 a day, the least in 5 years-
Stations122%3% 0 a day, more than 2 of the other 4 years-
Operations122%5% 0 a day, more than 2 of the other 4 years-
Operator, other5810%7% 2 a day, the least in 5 years2

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MNBrake and brake systems faults; including wheel flats where no other cause had been identified183
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)81
OCSignaller including mis-routing (not ERTM /ETCS related)33
Q3NZ Pumps T28
TTLeaf fall Neutral26
M7Door and Door system faults20
MUDepot operating problem19
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.18
MQConfirmed shoe beam or associated system faults Incl. train borne power switch over systems (DC)14
VHPassenger Communication cord, door egress or emergency train alarm operated14
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,534
TGDriver2,607
VHPassenger Communication cord, door egress or emergency train alarm operated2,446
ICTrack circuit failure (including no fault found)1,800
MNBrake and brake systems faults; including wheel flats where no other cause had been identified1,523
IBPoints failure (including no fault found)1,449
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,170
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,094
M8Technical failures above the Solebar924
OCSignaller including mis-routing (not ERTM /ETCS related)917