Leaves on the Line

Chessington South

CSS Wessex route
CSV JSON

474 delay minutes

The biggest share (25%) of the delay picked up at Chessington South in the four weeks to 9 December 2023 came from how the network was run.

75% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track429%8% 2 a day, more than 2 of the other 4 years2
Signals, points and power8318%16% 3 a day, more than 3 of the other 4 years1
Weather and structures--7% 0 a day, the least in 5 years-
Autumn6013%7% 2 a day, more than 3 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management12025%17% 4 a day, more than 2 of the other 4 years1
The operators' causes
Train faults6714%16% 2 a day, more than 3 of the other 4 years4
Traincrew398%11% 1 a day, more than 3 of the other 4 years7
Stations4<1%3% 0 a day, more than 1 of the other 4 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other5912%7% 2 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
I5Possession over-run from planned work70
Q3NZ Pumps T53
TTLeaf fall Neutral53
ICTrack circuit failure (including no fault found)44
IRBroken/cracked/twisted/buckled/flawed rail39
IBPoints failure (including no fault found)35
TGDriver31
MDTechnical failures below the solebar28
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)27
MNBrake and brake systems faults; including wheel flats where no other cause had been identified21
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)1,804
TTLeaf fall Neutral1,190
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,178
MDTechnical failures below the solebar1,138
TGDriver969
IBPoints failure (including no fault found)875
ICTrack circuit failure (including no fault found)861
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure801
MNBrake and brake systems faults; including wheel flats where no other cause had been identified791
T2Delay at unstaffed station to non-DOO train737