Leaves on the Line

London Cannon Street

CST Kent route
CSV JSON

3,039 delay minutes

The biggest share (23%) of the delay picked up at London Cannon Street in the four weeks to 9 December 2023 came from track faults.

88% of these minutes were knock-on from something that happened elsewhere first. 79% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track70123%8% 25 a day, the most in 5 years5
Signals, points and power2859%16% 10 a day, more than 2 of the other 4 years7
Weather and structures--7% 0 a day, the least in 5 years-
Autumn1856%7% 7 a day, the most in 5 years-
External25<1%4% 1 a day, the least in 5 years1
Network management46015%17% 16 a day, more than 3 of the other 4 years12
The operators' causes
Train faults49216%16% 18 a day, the most in 5 years12
Traincrew2348%11% 8 a day, more than 2 of the other 4 years3
Stations28<1%3% 1 a day, more than 1 of the other 4 years-
Operations1264%5% 5 a day, the most in 5 years2
Operator, other50417%7% 18 a day, more than 3 of the other 4 years2

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.663
VHPassenger Communication cord, door egress or emergency train alarm operated296
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)218
TGDriver210
Q3NZ Pumps T185
TTLeaf fall Neutral168
ICTrack circuit failure (including no fault found)156
MNBrake and brake systems faults; including wheel flats where no other cause had been identified115
MDTechnical failures below the solebar103
M7Door and Door system faults96
Since 2018
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)10,832
TGDriver9,841
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)8,975
IBPoints failure (including no fault found)8,677
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.5,080
VHPassenger Communication cord, door egress or emergency train alarm operated4,623
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure4,498
OCSignaller including mis-routing (not ERTM /ETCS related)4,219
MNBrake and brake systems faults; including wheel flats where no other cause had been identified3,930
IESignalling Functional Power Supply Failure3,537