Chadwell Heath
15 delay minutes
Most of the delay picked up at Chadwell Heath in the four weeks to 9 December 2023 came from faulty trains.
100% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | 8 | 53% | 16% | - |
| Traincrew | 7 | 47% | 11% | 1 |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | 1 |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M7 | Door and Door system faults | 8 |
| TG | Driver | 7 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M0 | Confirmed train cab based safety system fault (including GSMR) | 53 |
| M2 | Delay due to ATO / ETCS equipment | 49 |
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 48 |
| IB | Points failure (including no fault found) | 39 |
| M7 | Door and Door system faults | 33 |
| I5 | Possession over-run from planned work | 30 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 29 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 15 |
| I1 | Overhead line/third rail defect | 12 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 12 |