Derby
3,297 delay minutes
The biggest share (20%) of the delay picked up at Derby in the four weeks to 9 December 2023 came from weather and structures.
60% of these minutes were knock-on from something that happened elsewhere first. 81% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 338 | 10% | 8% | 12 a day, the most in 5 years | 3 |
| Signals, points and power | 383 | 12% | 16% | 14 a day, more than 1 of the other 4 years | 5 |
| Weather and structures | 668 | 20% | 7% | 24 a day, more than 3 of the other 4 years | 25 |
| Autumn | 139 | 4% | 7% | 5 a day, more than 3 of the other 4 years | - |
| External | 82 | 2% | 4% | 3 a day, more than 1 of the other 4 years | 1 |
| Network management | 439 | 13% | 17% | 16 a day, the least in 5 years | 21 |
| The operators' causes | |||||
| Train faults | 589 | 18% | 16% | 21 a day, more than 2 of the other 4 years | 9 |
| Traincrew | 335 | 10% | 11% | 12 a day, the most in 5 years | 20 |
| Stations | 58 | 2% | 3% | 2 a day, the least in 5 years | - |
| Operations | 111 | 3% | 5% | 4 a day, more than 3 of the other 4 years | - |
| Operator, other | 156 | 5% | 7% | 6 a day, more than 2 of the other 4 years | 2 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JK | Flooding not due to exceptional weather | 429 |
| TG | Driver | 254 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 179 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 151 |
| MD | Technical failures below the solebar | 147 |
| M8 | Technical failures above the Solebar | 134 |
| IB | Points failure (including no fault found) | 108 |
| MU | Depot operating problem | 108 |
| JB | Reactionary Delay to 'P' coded TSRs | 91 |
| I5 | Possession over-run from planned work | 82 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 8,819 |
| M8 | Technical failures above the Solebar | 8,590 |
| MD | Technical failures below the solebar | 8,383 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 6,058 |
| IB | Points failure (including no fault found) | 4,798 |
| M7 | Door and Door system faults | 3,970 |
| J3 | Axle Counter Failure | 3,771 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 3,643 |
| MU | Depot operating problem | 3,628 |
| TH | (Senior) Conductor/Train Manager | 3,313 |