408 delay minutes

The biggest share (25%) of the delay picked up at Dorchester South in the four weeks to 9 December 2023 came from signal, points and power faults.

73% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track164%8% 1 a day, the least in 5 years1
Signals, points and power10025%16% 4 a day, more than 3 of the other 4 years2
Weather and structures154%7% 1 a day, more than 1 of the other 4 years-
Autumn266%7% 1 a day, more than 2 of the other 4 years-
External51%4% 0 a day, the least in 5 years-
Network management8521%17% 3 a day, more than 2 of the other 4 years1
The operators' causes
Train faults7819%16% 3 a day, the most in 5 years4
Traincrew359%11% 1 a day, more than 2 of the other 4 years-
Stations328%3% 1 a day, the most in 5 years-
Operations72%5% 0 a day, the most in 5 years-
Operator, other102%7% 0 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar66
IBPoints failure (including no fault found)59
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)46
T2Delay at unstaffed station to non-DOO train29
TGDriver28
QHAdhesion problems due to leaf contamination16
IASignal failure (including no fault found)15
OMTechnical failure associated with a Railhead conditioning train14
IKTelecom equipment failure (including no fault found)13
IRBroken/cracked/twisted/buckled/flawed rail12
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,879
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)1,625
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,304
ICTrack circuit failure (including no fault found)1,159
TGDriver829
T2Delay at unstaffed station to non-DOO train810
MDTechnical failures below the solebar804
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions769
IBPoints failure (including no fault found)643
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles589