Dorchester South
408 delay minutes
The biggest share (25%) of the delay picked up at Dorchester South in the four weeks to 9 December 2023 came from signal, points and power faults.
73% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 16 | 4% | 8% | 1 a day, the least in 5 years | 1 |
| Signals, points and power | 100 | 25% | 16% | 4 a day, more than 3 of the other 4 years | 2 |
| Weather and structures | 15 | 4% | 7% | 1 a day, more than 1 of the other 4 years | - |
| Autumn | 26 | 6% | 7% | 1 a day, more than 2 of the other 4 years | - |
| External | 5 | 1% | 4% | 0 a day, the least in 5 years | - |
| Network management | 85 | 21% | 17% | 3 a day, more than 2 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 78 | 19% | 16% | 3 a day, the most in 5 years | 4 |
| Traincrew | 35 | 9% | 11% | 1 a day, more than 2 of the other 4 years | - |
| Stations | 32 | 8% | 3% | 1 a day, the most in 5 years | - |
| Operations | 7 | 2% | 5% | 0 a day, the most in 5 years | - |
| Operator, other | 10 | 2% | 7% | 0 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 66 |
| IB | Points failure (including no fault found) | 59 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 46 |
| T2 | Delay at unstaffed station to non-DOO train | 29 |
| TG | Driver | 28 |
| QH | Adhesion problems due to leaf contamination | 16 |
| IA | Signal failure (including no fault found) | 15 |
| OM | Technical failure associated with a Railhead conditioning train | 14 |
| IK | Telecom equipment failure (including no fault found) | 13 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 12 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,879 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,625 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,304 |
| IC | Track circuit failure (including no fault found) | 1,159 |
| TG | Driver | 829 |
| T2 | Delay at unstaffed station to non-DOO train | 810 |
| MD | Technical failures below the solebar | 804 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 769 |
| IB | Points failure (including no fault found) | 643 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 589 |