184 delay minutes

The biggest share (36%) of the delay picked up at Dorchester West in the four weeks to 9 December 2023 came from weather and structures.

71% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track42%8% 0 a day, more than 1 of the other 4 years-
Signals, points and power5429%16% 2 a day, more than 2 of the other 4 years-
Weather and structures6736%7% 2 a day, the most in 5 years-
Autumn74%7% 0 a day, more than 1 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management2212%17% 1 a day, more than 1 of the other 4 years-
The operators' causes
Train faults1810%16% 1 a day, more than 2 of the other 4 years-
Traincrew42%11% 0 a day, the least in 5 years-
Stations21%3% 0 a day, the least in 5 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other74%7% 0 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions63
IBPoints failure (including no fault found)34
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure15
OUDelays not Investigated by Network Rail15
MCDiesel Loco failure, defect, attention11
Q3NZ Pumps T7
TTLeaf fall Neutral7
IISignalling lineside cable fault5
I6Delays as a result of line blocks / track patrols (including late handback)4
IRBroken/cracked/twisted/buckled/flawed rail4
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.666
JHCritical Rail Temperature speeds, (other than buckled rails)545
TGDriver544
MDTechnical failures below the solebar531
ZUNo Cause Identified After investigation by both Parties512
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)509
ICTrack circuit failure (including no fault found)438
IBPoints failure (including no fault found)385
IASignal failure (including no fault found)370
M8Technical failures above the Solebar352