Leaves on the Line

Dorridge

DDG Central route
CSV JSON

967 delay minutes

The biggest share (20%) of the delay picked up at Dorridge in the four weeks to 9 December 2023 came from faulty trains.

66% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track4<1%8% 0 a day, the least in 5 years-
Signals, points and power12913%16% 5 a day, more than 1 of the other 4 years7
Weather and structures3<1%7% 0 a day, the least in 5 years-
Autumn394%7% 1 a day, the least in 5 years-
External15916%4% 6 a day, the most in 5 years-
Network management14014%17% 5 a day, the least in 5 years11
The operators' causes
Train faults19020%16% 7 a day, more than 2 of the other 4 years-
Traincrew16517%11% 6 a day, the least in 5 years18
Stations445%3% 2 a day, the least in 5 years-
Operations9<1%5% 0 a day, the least in 5 years-
Operator, other859%7% 3 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
XPBRIDGE HIT152
TGDriver148
MDTechnical failures below the solebar82
IBPoints failure (including no fault found)74
M8Technical failures above the Solebar68
MPRail / wheel interface, adhesion problems (including ice on the running rail)42
I8Animal Strike or Incursion within the control of Network Rail34
Q3NZ Pumps T32
TTLeaf fall Neutral31
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure27
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver8,150
MDTechnical failures below the solebar4,926
ZUNo Cause Identified After investigation by both Parties3,814
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,499
J3Axle Counter Failure3,488
IBPoints failure (including no fault found)3,042
TH(Senior) Conductor/Train Manager2,740
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,540
M8Technical failures above the Solebar2,355
ICTrack circuit failure (including no fault found)2,170