Dagenham Dock
130 delay minutes
Most of the delay picked up at Dagenham Dock in the four weeks to 9 December 2023 came from how the network was run.
12% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | 25 | 19% | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | 97 | 75% | 17% | - |
| The operators' causes | ||||
| Train faults | 5 | 4% | 16% | - |
| Traincrew | 2 | 2% | 11% | - |
| Stations | - | - | 3% | - |
| Operations | 1 | <1% | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 87 |
| IH | Power Supply And Distribution System Failure | 22 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 10 |
| MU | Depot operating problem | 5 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 3 |
| FC | Freight Train Driver error, SPAD, Wrong routing or Missed AWS/DSD [No change] | 2 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 1 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 509 |
| XR | Cable vandalism or theft | 471 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 365 |
| TG | Driver | 254 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 251 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 227 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 208 |
| XL | Fire external to but directly affecting the network (incl. line blocks for emergency services attending off network incidents) | 188 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 178 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 174 |