CSV JSON

680 delay minutes

The biggest share (20%) of the delay picked up at Deal in the four weeks to 9 December 2023 came from other operator causes.

50% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track6<1%8% 0 a day, more than 1 of the other 4 years-
Signals, points and power6610%16% 2 a day, more than 1 of the other 4 years-
Weather and structures13219%7% 5 a day, the most in 5 years-
Autumn12318%7% 4 a day, more than 2 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management10115%17% 4 a day, more than 3 of the other 4 years-
The operators' causes
Train faults7511%16% 3 a day, the most in 5 years-
Traincrew193%11% 1 a day, the least in 5 years-
Stations112%3% 0 a day, more than 2 of the other 4 years-
Operations91%5% 0 a day, more than 2 of the other 4 years-
Operator, other13820%7% 5 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
OGIce on conductor rail/OHLE132
Q3NZ Pumps T123
TTLeaf fall Neutral121
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)27
IBPoints failure (including no fault found)25
OCSignaller including mis-routing (not ERTM /ETCS related)23
ICTrack circuit failure (including no fault found)21
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident19
M0Confirmed train cab based safety system fault (including GSMR)17
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps17
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,672
TTLeaf fall Neutral1,422
Q3NZ Pumps T1,233
TGDriver1,231
ICTrack circuit failure (including no fault found)1,005
OCSignaller including mis-routing (not ERTM /ETCS related)945
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)698
IHPower Supply And Distribution System Failure691
IBPoints failure (including no fault found)662
MPRail / wheel interface, adhesion problems (including ice on the running rail)623