Dewsbury
3,950 delay minutes
The biggest share (20%) of the delay picked up at Dewsbury in the four weeks to 9 December 2023 came from how the network was run.
86% of these minutes were knock-on from something that happened elsewhere first. 89% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 507 | 13% | 8% | 18 a day, the most in 5 years | - |
| Signals, points and power | 248 | 6% | 16% | 9 a day, more than 1 of the other 4 years | - |
| Weather and structures | 285 | 7% | 7% | 10 a day, the most in 5 years | - |
| Autumn | 406 | 10% | 7% | 15 a day, the most in 5 years | - |
| External | 236 | 6% | 4% | 8 a day, the most in 5 years | - |
| Network management | 784 | 20% | 17% | 28 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 509 | 13% | 16% | 18 a day, more than 2 of the other 4 years | - |
| Traincrew | 415 | 10% | 11% | 15 a day, more than 2 of the other 4 years | - |
| Stations | 161 | 4% | 3% | 6 a day, more than 2 of the other 4 years | - |
| Operations | 212 | 5% | 5% | 8 a day, more than 3 of the other 4 years | - |
| Operator, other | 188 | 5% | 7% | 7 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IR | Broken/cracked/twisted/buckled/flawed rail | 332 |
| OU | Delays not Investigated by Network Rail | 328 |
| TG | Driver | 232 |
| QJ | Special working for leaf-fall track circuit operation | 224 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 195 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 159 |
| MD | Technical failures below the solebar | 144 |
| I5 | Possession over-run from planned work | 134 |
| Q3 | NZ Pumps T | 132 |
| TH | (Senior) Conductor/Train Manager | 116 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 11,534 |
| MD | Technical failures below the solebar | 7,537 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 5,573 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 4,554 |
| TH | (Senior) Conductor/Train Manager | 4,240 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 3,966 |
| M7 | Door and Door system faults | 3,855 |
| IC | Track circuit failure (including no fault found) | 3,617 |
| M8 | Technical failures above the Solebar | 3,522 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 2,991 |